Sprint Capacity Planning: A Plan That Still Fits When the Team Changes

Reviewer assignments, ticket allocation, status readouts and midweek changes run through one Kylon room. Agents read GitHub and the Notion sprint page, and the engineering manager approves every allocation before anything is added to Asana.

Get started
Kylon TeamProduct

Thirty-two tickets and a capacity number that will not sit still

Sprint planning starts as arithmetic. Each engineer has a capacity for the two weeks, each ticket has an estimate and a priority, and every open pull request needs a reviewer who knows that part of the code. Fitting thirty-two tickets inside those limits takes an hour with the backlog. Keeping the plan honest for ten working days is the real job.

The pieces live in different places. Capacity, estimates and priority order sit on the Notion sprint page, review history and merge state in GitHub, assigned work in Asana, leave notices in Slack and support escalations in Gmail. By Wednesday someone is out, a must-fix bug has arrived, and the generated status readout in Google Drive still says a pull request merged when it did not.

Who works in the room

People

  • Engineering manager

    Sets each engineer's capacity for the sprint and approves the allocation and every displacement

  • Product manager

    Ranks the backlog and decides whether an escalated bug is must-fix

  • Tech leads

    Confirm reviewer assignments and correct estimates during grooming

  • Engineers

    Post leave and blockers in Slack, pick up their tickets and review each other's pull requests

Agents

  • MycoSprint planner

    Fits the sprint's tickets to each engineer's capacity in priority order, proposes pull request reviewers from GitHub history, and adds the approved work to Asana

    AsanaGitHubNotionSlack
  • NovaReadout checker

    Checks each generated status readout against GitHub and the plan as it stands, lists every wrong line, and drafts the corrected readout for the manager to send

    GitHubGoogle DriveNotionGmail

Each squad keeps one Kylon room. Myco is the default agent, so a note that someone is out reaches it without a mention, and questions about the readout go to Nova, which owns that check. When Myco changes the plan, it posts the changed tickets in the thread and mentions Nova, so the next readout is checked against the plan as it stands, not as it was on Monday. In this room GitHub is read-only and Asana is add-only: agents read evidence from one and add new work to the other, and only people edit or close what is already there.

Two weeks, six stages

Capacity rules and the priority order live in the room guidelines and on the sprint page, so both agents work from the same numbers. Each stage stops at a person before anything is created.

  • Agent works
  • Person decides
  • Arrives or gets recorded
Scroll sideways to see the whole flow.
StageWhat happensWho actsWho decides
PlanningTickets are fitted in priority order to each engineer's capacity, and each open pull request gets a proposed reviewer from GitHub historyMycoThe engineering manager approves, then Myco adds the work to Asana
Readout reviewThe generated status readout is checked line by line against GitHub merge state and the planNovaThe engineering manager confirms the corrections before the readout goes out
Must-fix escalationThe escalated bug enters at the top and the lowest-priority tickets that no longer fit move outMycoThe product manager confirms it is must-fix; the engineering manager approves what moves
LeaveThe absent engineer's remaining tickets are refitted within capacity or returned to the backlogMycoThe engineering manager approves the new allocation
Grooming correctionsChanged estimates and split tickets are refitted, and anyone pushed over capacity is flaggedMyco, then NovaTech leads confirm the estimates
Backlog sweep and closeoutUnfinished tickets return to the backlog with a reason, and the closeout is tallied from GitHub and Asana as they standNovaThe engineering manager signs off the sprint summary
Stages of a two-week sprint. Tickets, people and estimates in this example are illustrative.

Midweek, someone is out and a bug jumps the queue

Leave rarely arrives as data. A manager writes in Slack that Leo is out from Wednesday. Myco takes that message as the source for the change and proposes a refit that removes Leo's remaining capacity and moves only his open tickets: each one goes to an engineer with room and relevant review history, or back to the backlog with a note. Nobody else's plan moves.

A must-fix bug works the other way round. Support escalates it by email, the product manager confirms it, and it goes in at the top. Myco shows exactly which low-priority tickets it displaces and why those, and the engineering manager approves before anything new reaches Asana. Teams that already work with Claude Code or Codex can add it to the room to start on the fix in the same thread. Its pull request still goes through a human review like any other.

What the checks catch

  • An engineer on leave who still holds open tickets, or whose capacity was never reduced
  • An allocation that puts someone over capacity after grooming raised an estimate
  • A readout line that marks a pull request merged, or a ticket done, when GitHub shows otherwise
  • A displaced ticket that was dropped instead of returned to the backlog with a reason
  • A proposed change that would edit or close existing work in Asana, which the room guidelines do not allow

What stays with people

  • Approving the allocation and reviewer list before anything is added to Asana
  • Deciding whether an escalated bug is must-fix, and what it displaces
  • Reviewing and merging every pull request in GitHub
  • Sending the weekly readout, which Nova prepares as a Gmail draft

Integrations in this workflow

Kylon is not a project tracker or a code host, and it does not replace either. It works across the tools the team already uses and keeps the coordination for the sprint in one room.

  • Notion holds the sprint page: capacity per engineer, estimates and the priority order
  • GitHub is read-only evidence: pull requests, review history and merge state
  • Asana receives each allocated ticket and review assignment as new work, added only after approval
  • Google Drive keeps the generated status readouts and the team's capacity rules
  • Gmail brings support escalations in and carries the weekly readout out, as a draft a person sends
  • Slack is where engineers post leave, blockers and quick updates

Where to start

Pick one squad and one sprint. Connect the Notion sprint page, connect GitHub for Myco and Nova with a room guideline that keeps it read-only, and write the one rule that matters most: agents may propose allocations and reviewers, and nothing is created in Asana until the engineering manager approves.

“Every change refits only the tickets it touches, so the rest of the sprint stays where people left it.”

Set it up with your agent

Open a new Room, add your agent and paste this prompt. It connects the tools, builds the App with you and asks for your rules one step at a time, and nothing goes out until a person approves it.

Set-up prompt

Your first company harness. Where humans and agents run your business together.

Get started

More Use Cases

View all

API Deprecation Migration: Cutoff Waves That Stay Right as Integrations Move

Retiring an API version runs through one Kylon room. Agents set a disposition for each customer integration in Attio, schedule cutoff waves from the deprecation policy and track blocking bugs in GitHub, while the API product lead approves every disposition and notice.

Software & SaaSEngineering operationsEmail operations

Backup Restore Verification: Backups Proven Restorable Within Their Class Interval

A backup counts only once someone has proved it restores. Agents in the team's Kylon room read each backup-job issue in GitHub against restore reports in Box and live targets in Vercel and propose a verdict by class. The reliability lead approves before any issue changes.

Software & SaaSIT & security operations