HOME>Use Cases>Dock Appointment Scheduling: A Door Plan That Survives Outages and Late Carriers
Use Case8 min read

Dock Appointment Scheduling: A Door Plan That Survives Outages and Late Carriers

The day's dock plan, the yard coordinator's draft, a door outage, carrier window shifts and a priority load run through one Kylon room. Agents re-walk each door group in SharePoint and book the calendar, and the dock lead approves every change.

Get started
Kylon TeamProduct

Twenty-six trucks, six doors and windows that will not all fit

An inbound dock day starts with a list of loads, each with a carrier window and an unload time, and a set of doors that are not interchangeable. Dry freight goes to the standard doors, refrigerated loads to the reefer doors, and hazmat to the one door set up for it. Each group is scheduled in load id order: a load takes the door that frees up first, starts when both the door and its window allow, and either makes its window or misses it.

The load list is a SharePoint list, the dock calendar is in Google Calendar, the scheduling policy and the yard coordinator's draft are in Google Drive, and maintenance and the yard talk in Slack. When a door fails at 6 AM, the usual fix is to slide the loads that were on it somewhere else, which leaves everything behind them scheduled around a gap that no longer exists.

Who works in the room

People

  • Dock lead

    Owns the day's plan, approves every walk and signs the utilization summary

  • Yard coordinator

    Drafts the schedule, moves trailers to doors and checks arrivals

  • Transportation coordinator

    Talks to carriers about windows and calls the ones whose loads now miss

Agents

  • RyanDock scheduler

    Walks each door group in load id order, proposes a door and start time for every load, and books the calendar after approval

    SharePointGoogle CalendarGoogle DriveSlack
  • AdaSchedule checker

    Checks the yard coordinator's draft and every re-walk against the policy, and reads the final records for close-out

    SharePointGoogle Drive

The plan has one owner in this room: Ryan, the default agent, so a door status relayed from maintenance reaches Ryan without a mention. Ada checks Ryan's work and the yard coordinator's draft, and is mentioned when a check is needed. At the end of the day the dock lead opens a close-out thread for Ada whose first message is the brief, and Ada reads the final records rather than taking Ryan's last message as the answer.

The dock day, from first plan to close

The policy's walk is the same every time, and the room guidelines tell both agents to use it. Each step stops for the dock lead.

  • Agent works
  • Person decides
  • Arrives or gets recorded
Scroll sideways to see the whole flow.
StageWhat happensWho actsWho decides
Day planStandard, refrigerated and hazmat loads are walked as separate groups in load id order, each over its own doorsRyan, from the SharePoint load listThe dock lead approves before SharePoint and the calendar change
Draft reviewThe yard coordinator's draft is compared with the approved plan line by line, with no changes madeAdaThe yard coordinator corrects the draft
Door outageThe standard group is re-walked from scratch over the doors still workingRyan, checked by AdaThe dock lead approves, and carriers are called for missed windows
Carrier window shiftNew windows are written, then the refrigerated and hazmat groups are each re-walkedRyanThe dock lead approves
Priority loadThe existing pending load is activated and walked first in the standard groupRyanThe dock lead approves the activation
Door return and close-outThe standard group is re-walked over all doors, then per-door utilization and missed windows are read from SharePointRyan, then AdaThe dock lead signs the day's summary
A dock day from first plan to close. All loads, doors and times are illustrative.

Why the whole group is walked again

Start times chain. A load's start depends on when its door frees up, which depends on every load before it on that door. So when D-02 goes out, Ryan walks all 14 standard loads again from the first load id over the two remaining doors and proposes every field that changes. A new calendar event goes out only for a load whose door or start time moved, and Ada confirms that the other groups were left alone.

Some changes are smaller than they look. A carrier's email moving every refrigerated and hazmat window 90 minutes later changes those two groups and leaves the standard group as it was. A priority load was already on the list as pending, so it is activated, not created a second time, and walked first. When D-02 comes back after lunch, the standard group is walked again over all three doors, priority load first.

What the checks catch

  • A refrigerated or hazmat load placed on a door outside its own group
  • A re-walk that starts from the load that moved instead of the first load in the group
  • A priority load added as a new item when it already exists as a pending one
  • Out-of-scope loads at the end of the list left exactly as they were
  • Close-out figures read from the final SharePoint records, not added up from earlier walks

What stays with people

  • Approving each plan and re-walk before SharePoint or the calendar changes
  • Calling carriers whose loads now miss their window
  • Activating a priority load, which only the dock lead does
  • Signing the day's utilization summary

Integrations in this workflow

Kylon is not a yard or dock management system and is not meant to replace one. It works on top of the SharePoint list and the calendar the dock already runs, and the room holds the coordination between them. The dock lead approved a lasting grant on both connections for this room, so Ryan can write once a change is approved.

  • Google Calendar
  • Google Drive
  • SharePoint
  • Slack
  • SharePoint holds the load list: windows, unload minutes, door, start time, missed window and slack
  • Google Calendar carries one event per load on its door's calendar, and a summary per door at close
  • Google Drive keeps the scheduling policy, the yard coordinator's draft and carrier notices
  • Slack is where maintenance and the yard post door status and trailer arrivals

Where to start

Shadow one day's inbound schedule in the room next to the current process. Connect the SharePoint load list and the dock calendar, set an automation to open the day's plan at 5 AM, and put one rule in the room guidelines: any change re-walks the affected group from its first load, and the dock lead approves the result before a door or time changes.

“The plan is rebuilt in the same order every time, so the dock lead can see exactly what moved and why.”

Set it up with your agent

Open a new Room, add your agent and paste this prompt. It connects the tools, builds the App with you and asks for your rules one step at a time, and nothing goes out until a person approves it.

Set-up prompt

Your first company harness. Where humans and agents run your business together.

Get started

More Use Cases

View all

Backorder Communications: Customers Hear the Latest Date, Not Last Week's

Customers hear the latest supplier date, an approved substitute or a cancellation offer, line by line. Agents work Pipedrive lines against Outlook notices and the Notion substitution table in one Kylon room, and every notice is a draft a rep sends.

Logistics & supply chainEmail operationsSupport & customer success

Carrier Damage Claims: Filings That Match the Tariff and the Paperwork

Thirty freight damage claims, the filing manifest, carrier acceptances, a disputed delivery receipt and a tariff revision run through one Kylon room. Agents read ClickUp and the Dropbox claim packets, and the claims manager approves every change.

Logistics & supply chainFinance operationsSupport & customer success